Workplace grant

Government Office for Zero Emission Vehicles (OZEV)

Grant Schemes for Workplaces

Fleet & Employee Grant: £4,250 is provided in grants to an SME (less than 250 employees) to install five charge points, with a further £850 available for installing each additional charge point, up to a total of £15,000.

And it doesn’t end here. Multi-site companies can claim grants of up to £15,000 for each site across a maximum of five sites. Making the total grant available in these situations £75,000.

Workplace Charging Scheme: £350 grant is provided to any registered business, charity or public sector organisation installing an EV charger at work. Each workplace can claim for up to 40 EV chargers, worth a maximum of £14,000.

Both grants can not be used together for the same EV charger installation, and designated parking (where the chargers are to be fitted) is required in both instances.

As an accredited government grant installer, we’ll help you choose the correct smart EV charger solution to fulfill your needs, whilst helping you through the grant process to make sure any grant monies due are deducted from your installation costs.

Grant accredited installers and smart EV chargers

If you qualify, to claim these grants you must choose qualifying EV smart chargers, and appoint an OZEV approved workplace grant installer to carry out the install.

Book a free site survey here

Please complete our form, and we'll call you to book a convenient time for our workplace specialist to provide a physical consutation with site survey.

0
0
Your Cart
Your cart is emptyReturn to Shop

Electric Vehicle Homecharge Scheme

The scheme is currently open to applicants that:

  1. Rent their house or bungalow.
  2. Own or rent an apartment / flat.
  3. Are the landlord of a domestic rental property.
  4. Are a social housing provider.
  5. Has dedicated off-road parking at the property.
  6. Own or have ordered a qualifying vehicle.
  7. Have not previously claimed an OLEV grant.

Not sure if you are eligible?

Contact us to discuss your individual requirements.

Standard installation terms

  1. Fitting of an EV charger on a brick wall, or to another suitable permanent structure.
  2. Up to 10 metres of cable, run and neatly clipped to the wall between the electricity supply meter/distribution board and the charging unit.
  3. Supply meter/distribution board on the inside of an outside wall.
  4. Routing the cable through a drilled hole in a wall up to 500mm thick (if required).
  5. Fitting & testing of electrical connections & protections required for the EV charger.
  6. An additional three-way consumer unit (if required).
  7. Installation of a Type C MCB and a Type A RCD or a type A RCBO.
  8. No groundworks 

Not standard installation?

Contact us to discuss your individual requirements.