Artboard 1eslogo

Pod Point fast electric car charger installed

Pod Point electric car charger installation

We’ve been in sunny Trawden (Lancashire) today…

Brad our senior installation technician is fitting an electric car charger, it’s a Pod Point 32Amp fast charger.

You can get 16Amp electric car chargers, but they’re not much better than using a standard plug and take up to 22 hours to fully charge your electric car.

Whereas this Pod Point 32Amp fast electric car charger will have it fully charged in 10 or 11 hours.

So, make sure you only purchase a 32Amp electric car charger, when you need one.

Brad had to do some ground works today, taking the main cable from the side electricity box, underneath some flag stones, and then channeled it up the side of the garage.

With the Pod Point chargers they come with a special safety device called a CT, which protects the main fuse in the house from being overloaded.

Which makes Pod-Point electric car chargers very safe for installing at your home.

Our installations cover Lancashire, Merseyside, Cheshire, Greater Manchester and even parts of West Yorkshire, and Brads always providing great service to all our customers.

If you or you know someone who’s wants the right electric car charger installed, please visit our website at evolutionsolutions.co.uk and complete our application form.

We’re OLEV grant approved and we’ll make it very simple, by filling in the paperwork for you, all you’ve got to do is approve the paperwork.

…and you’ll receive a £350 government grant towards the cost.

AutHOR

Alison Whitfield

News Categories
Categories
SHARE
UPDATED
1 December 2020
0
0
Your Cart
Your cart is emptyReturn to Shop

Electric Vehicle Homecharge Scheme

The scheme is currently open to applicants that:

  1. Rent their house or bungalow.
  2. Own or rent an apartment / flat.
  3. Are the landlord of a domestic rental property.
  4. Are a social housing provider.
  5. Has dedicated off-road parking at the property.
  6. Own or have ordered a qualifying vehicle.
  7. Have not previously claimed an OLEV grant.

Not sure if you are eligible?

Contact us to discuss your individual requirements.

Standard installation terms

  1. Fitting of an EV charger on a brick wall, or to another suitable permanent structure.
  2. Up to 10 metres of cable, run and neatly clipped to the wall between the electricity supply meter/distribution board and the charging unit.
  3. Supply meter/distribution board on the inside of an outside wall.
  4. Routing the cable through a drilled hole in a wall up to 500mm thick (if required).
  5. Fitting & testing of electrical connections & protections required for the EV charger.
  6. An additional three-way consumer unit (if required).
  7. Installation of a Type C MCB and a Type A RCD or a type A RCBO.
  8. No groundworks 

Not standard installation?

Contact us to discuss your individual requirements.