Artboard 1eslogo

0% finance replaces home charging point grant

home charging point grant

Having a home EV charger installed has become more expensive for most people…

Why?

In March, the government ended the £350 home charging point grant for house owners with off-road parking.

Only people renting a domestic property, who own an apartment or have a business registered at home on their incorporation or Vat certificate, can claim the £350 home charging point grant (need off-road parking).

Unfortunately, those who own a house with off-road parking can no longer get the grant, which is about 80% of people in need of a home EV charger, as they have an electric car arriving soon.

At any time (let alone during a cost-of-living crisis) finding this extra cash can be a challenge.

So, how can we help?

Our solution is to provide 0% finance on all our home EV charge point installations, allowing people to spread the payment over time, with zero interest.

Customers still get all the benefits from using us, like:

  • A wide selection of charge points
  • Guaranteed installation dates and times
  • Using specialists – as charge points is all we do
  • We’re regulated, which means safe installations
  • Not a contractor in sight – we employ highly trained installers only

So why wouldn’t you?

Whether you qualify for a home charging point grant, or you’d like to spread payments with 0% finance (you can even do both if you wish), complete our contact form and our experienced advisor will call you.

…our contact form is at: https://www.evolutionsolutions.co.uk/contact/

AutHOR

Alison Whitfield

News Categories
Categories
SHARE
UPDATED
28 August 2022
0
0
Your Cart
Your cart is emptyReturn to Shop

Electric Vehicle Homecharge Scheme

The scheme is currently open to applicants that:

  1. Rent their house or bungalow.
  2. Own or rent an apartment / flat.
  3. Are the landlord of a domestic rental property.
  4. Are a social housing provider.
  5. Has dedicated off-road parking at the property.
  6. Own or have ordered a qualifying vehicle.
  7. Have not previously claimed an OLEV grant.

Not sure if you are eligible?

Contact us to discuss your individual requirements.

Standard installation terms

  1. Fitting of an EV charger on a brick wall, or to another suitable permanent structure.
  2. Up to 10 metres of cable, run and neatly clipped to the wall between the electricity supply meter/distribution board and the charging unit.
  3. Supply meter/distribution board on the inside of an outside wall.
  4. Routing the cable through a drilled hole in a wall up to 500mm thick (if required).
  5. Fitting & testing of electrical connections & protections required for the EV charger.
  6. An additional three-way consumer unit (if required).
  7. Installation of a Type C MCB and a Type A RCD or a type A RCBO.
  8. No groundworks 

Not standard installation?

Contact us to discuss your individual requirements.