Artboard 1eslogo

Electric vehicle charging points £75,000 grant

electric car charge point

Less than 250 employees and thinking of switching to electric vehicles?

We can help you claim up to £75,000 in grants to install electric vehicle charging points to support both fleet and employee electric vehicles.

And you don’t even need an electric vehicle to claim this grant. But you best be quick, as once the pot is empty is back to paying the full price..

Basically we can get you a grant of £4250 for every 5 electric vehicle charging points you install.

But what does this mean?

Currently, a used book retailer in Lancashire is installing 5 fast charging points. After all deductions (including £4250 grant), their net cost is just £950.

Amazing isn’t it?

To book your free ‘no obligation’ consultation with site survey fill in our enquiry form at:

https://www.evolutionsolutions.co.uk/workplace-grants/

AutHOR

Alison Whitfield

News Categories
Categories
SHARE
UPDATED
4 September 2022
0
0
Your Cart
Your cart is emptyReturn to Shop

Electric Vehicle Homecharge Scheme

The scheme is currently open to applicants that:

  1. Rent their house or bungalow.
  2. Own or rent an apartment / flat.
  3. Are the landlord of a domestic rental property.
  4. Are a social housing provider.
  5. Has dedicated off-road parking at the property.
  6. Own or have ordered a qualifying vehicle.
  7. Have not previously claimed an OLEV grant.

Not sure if you are eligible?

Contact us to discuss your individual requirements.

Standard installation terms

  1. Fitting of an EV charger on a brick wall, or to another suitable permanent structure.
  2. Up to 10 metres of cable, run and neatly clipped to the wall between the electricity supply meter/distribution board and the charging unit.
  3. Supply meter/distribution board on the inside of an outside wall.
  4. Routing the cable through a drilled hole in a wall up to 500mm thick (if required).
  5. Fitting & testing of electrical connections & protections required for the EV charger.
  6. An additional three-way consumer unit (if required).
  7. Installation of a Type C MCB and a Type A RCD or a type A RCBO.
  8. No groundworks 

Not standard installation?

Contact us to discuss your individual requirements.