Artboard 1eslogo

Electric car charge point website product finder

electric car charge point website

Isn’t your website your marketing window to the world?

After 3-year we’ve just had a refresh, and to be honest it was well overdue.

In just a few short years our original electric car charge point website became outdated.

Why?

Because a lot has changed in the electric charger installation world since we first started out:

  • £350 home charging point grant stopped for all house owners
  • £350 home charging point grant started for people who rent or own an apartment
  • Staff and fleet grant of up to £75,000 launched for companies to install chargers
  • Loads of new electric vehicle charging points launched
  • Finance options (including 0%) required for those who can no longer get a grant

To be honest, our old site had become clunky and cumbersome, making it difficult for customers to navigate to understand all of these changes.

It needed a complete rebuild to incorporate the new world of charging, but also had to be clean and simple to navigate.

Choosing the right charge point for you can be confusing, so we’ve incorporated a simple to use product finder – which in a few simple steps – will lead to the right charger for you.

In-conjunction, you can place your order online too. Payment or finance will not be processed until we’ve agreed an installation date and verified it’s a safe standard installation.

Do you want to know the best bit?

In celebration were providing up to a £200 discount on a home charger installation.

…which is available now at: https://www.evolutionsolutions.co.uk/

AutHOR

Alison Whitfield

News Categories
Categories
SHARE
UPDATED
31 August 2022
0
0
Your Cart
Your cart is emptyReturn to Shop

Electric Vehicle Homecharge Scheme

The scheme is currently open to applicants that:

  1. Rent their house or bungalow.
  2. Own or rent an apartment / flat.
  3. Are the landlord of a domestic rental property.
  4. Are a social housing provider.
  5. Has dedicated off-road parking at the property.
  6. Own or have ordered a qualifying vehicle.
  7. Have not previously claimed an OLEV grant.

Not sure if you are eligible?

Contact us to discuss your individual requirements.

Standard installation terms

  1. Fitting of an EV charger on a brick wall, or to another suitable permanent structure.
  2. Up to 10 metres of cable, run and neatly clipped to the wall between the electricity supply meter/distribution board and the charging unit.
  3. Supply meter/distribution board on the inside of an outside wall.
  4. Routing the cable through a drilled hole in a wall up to 500mm thick (if required).
  5. Fitting & testing of electrical connections & protections required for the EV charger.
  6. An additional three-way consumer unit (if required).
  7. Installation of a Type C MCB and a Type A RCD or a type A RCBO.
  8. No groundworks 

Not standard installation?

Contact us to discuss your individual requirements.