Artboard 1eslogo

Leading UK motor finance group become carbon neutral

DSG Group is a collective of forward-thinking brands and investments, which specialises in UK motor finance and focuses on compliant technology-driven delivery.

The company focus is on FinTech, and the increasing use of this to improve the scope and efficiency of their products. And as a leading-edge financial tech company getting to net zero is also a target.

DSG are already accredited with carbon neutrality. Achieved through waste management, carbon off-setting programs and switching their entire fleet to electric vehicles (including EV charge points).

To understand their charging requirement, we provided a free consultation with site survey, to discuss needs, charge point speed location features and aesthetics, and to check electricity capacity.

Our solution provides fast charging (up to 22Kw) for four vehicles simultaneously and includes two twin socket Project EV pedestals, which required groundworks, concrete pads, and safety barriers.

As a government approved charge point installer, our role is to help companies access the grant system, and as part of our consultation we helped DSG Group save £1,400.00 in the process.

Achieving carbon neutrality is just phase 1 for DSG Group in their quest to get to net zero. Their next project is to look at the feasibility and impact of implementing solar panel and battery technology.

Please email darren@evolutionsolutions.co.uk or call 07887 548523 for any further required details.

0
0
Your Cart
Your cart is emptyReturn to Shop

Electric Vehicle Homecharge Scheme

The scheme is currently open to applicants that:

  1. Rent their house or bungalow.
  2. Own or rent an apartment / flat.
  3. Are the landlord of a domestic rental property.
  4. Are a social housing provider.
  5. Has dedicated off-road parking at the property.
  6. Own or have ordered a qualifying vehicle.
  7. Have not previously claimed an OLEV grant.

Not sure if you are eligible?

Contact us to discuss your individual requirements.

Standard installation terms

  1. Fitting of an EV charger on a brick wall, or to another suitable permanent structure.
  2. Up to 10 metres of cable, run and neatly clipped to the wall between the electricity supply meter/distribution board and the charging unit.
  3. Supply meter/distribution board on the inside of an outside wall.
  4. Routing the cable through a drilled hole in a wall up to 500mm thick (if required).
  5. Fitting & testing of electrical connections & protections required for the EV charger.
  6. An additional three-way consumer unit (if required).
  7. Installation of a Type C MCB and a Type A RCD or a type A RCBO.
  8. No groundworks 

Not standard installation?

Contact us to discuss your individual requirements.